Commercial EV Charging Case Study

Installation of 5 FLO CORE+ (MAX) EV chargers From main EV electrical room, pull power from the main switch and install a dedicated EV distribution panel for all EV chargers.
500 W12 St.
  • City Electrical Permit Application
  • Electrical Inspection
  • City Final inspections
  • Installation of 5 FLO CORE+ (MAX) EV chargers From main EV electrical room, pull power from the main switch and install a dedicated EV distribution panel for all EV chargers.
  • Charging stations are located the other side of the building, roughly 150 ~ 180 meters away.
  • Each EV charger uses 100 AMP circuit breakers, therefore, #2/0 AWG copper RW 90 cable will be needed. Coring & X-Ray and mounting EV chargers on the wall with cord management system.
  • Mounting of bollard in front of the pedestals.